
Room to Land: Málaga Airport’s €830 Million Next Chapter
You know the moment.
The doors slide open at Arrivals.
The heat finds you before the taxi rank does.
Forty minutes later, you're on a terrace in Marbella.
For most of our clients, the Costa del Sol begins at Málaga Airport.
And that front door is about to get a great deal bigger.
Now boarding! The news
On 15 September, Spain's Council of Ministers gave final approval to DORA III, the national airport investment plan for 2027–2031, worth almost €13 billion across Aena's network. Málaga's share: €830 million.
That is the fourth-largest investment in any single Spanish airport. It's lower than the €1.5 billion once floated, but it is now official, and contracts worth €90 million have already been approved. The most ambitious upgrade the airport has seen since Terminal 3 opened in 2010.
Overbooked. Why now?
Because the numbers left no other option.
2025 closed with 26.7 million passengers, an all-time record. 2026 is running 6.6% ahead, with more than 3 million people passing through in August alone. The UK remains, by some distance, the largest market.
Current capacity sits at around 30 million. Aena's own forecasts put traffic close to 31 million by 2031.
Put simply: the Costa del Sol has outgrown its airport.
Upgraded. What changes?
- More space. The terminal grows from 80,000 to 140,000 m², almost double.
- A dedicated non-Schengen pier, with centralised passport control –good news for anyone flying in from the UK–.
- More boarding gates and larger security areas.
- A redesigned baggage system. Less waiting at the belt.
- 41% more space for shops and restaurants, and larger VIP lounges.
- New taxiways, better access roads and more parking.
- Capacity rising to 36 million passengers a year.
The two existing runways stay as they are. They're expected to handle long-term demand comfortably.
The ambition: around 200 destinations worldwide, and Málaga as a genuine international hub.
Estimated time of arrival. When?
The design is already under way. Major works are expected to begin from 2028, carried out in phases so the airport keeps running throughout. A few years of cranes — then a gateway that finally matches the destination.
Final approach. What it means for you?
If you already own here: easier comings and goings. Shorter queues, more space, more room for new routes.
If you're considering buying, read it for what it is: a long-term, publicly backed commitment to the region's accessibility. Ease of access has always been one of the quiet foundations of demand on this coast. Marbella sits well within reach.
And so it lands
The destination was always ready. Now, the way in is catching up.
If you'd like to talk about what this means for your plans on the coast, we're here. And if you enjoyed this, there's much more in our Journal. Keep reading!